ULTRASONIC TESTCRETE system basic field operation step by step
instructions
|
 |
|
|
|
|
|
|
|
|
|
|
STEP 1:
connect the cables. no mismatch can occur since each connector is
unique.
One side is connected to
the USG256 panel, and the other to the appropriate device (probes, meter
wheel)
this picture shows the
cables connected to the USG256 panel.

|
 |
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
STEP 2: Turn on the USG256
 |
 |
|
|
| |
|
|
|
STEP 3:
Press "1" - Ultrasonic .

|
 |
|
|
| |
|
|
|
STEP 4:
Press "1" - New pile log .
Enter the probes as a
pair to the ducts.
 |
 |
|
|
| |
|
|
|
STEP 5:
Enter parameters
it is recommended to
enter "6" - "set log parameters" to view the signal and set origin.
 |
 |
|
|
| |
|
|
|
STEP 6: Lower the probes as a pair to the bottom (keep
them at the same level) and set the cables on the meter wheel. |
 |
|
|
| |
|
|
|
STEP 7: Press "7" - START LOG |
 |
|
|
| |
|
|
|
STEP 8: Pull the probes.
 |
 |
|
|
| |
|
|
|
STEP 9:
When probes reach pile head (top surface), press "Esc" key.
a message indicating data
store appear.
 |
 |
|
|
| |
|
|
|
|
|
|