STEP 1: connect the cables. no mismatch can occur since each connector is unique.

One side is connected to the USG256 panel, and the other to the appropriate device (probes, meter wheel)

this picture shows the cables connected to the USG256 panel.

 
   
       
     

STEP 2: Turn on the USG256

 
     

STEP 3: Press "1" - Ultrasonic .

 

 
     

STEP 4: Press "1" - New pile log .

Enter the probes as a pair to the ducts.

 
     

STEP 5: Enter parameters

it is recommended to enter "6" - "set log parameters" to view the signal and set origin.

 
     
STEP 6: Lower the probes as a pair to the bottom (keep them at the same level) and set the cables on the meter wheel.
 
     
STEP 7: Press "7" - START LOG
 
     
STEP 8: Pull the probes.

 
     

STEP 9: When probes reach pile head (top surface), press "Esc" key.

a message indicating data store appear.

 
           